Manor Gardens Site Update
- Blockwork below DPC completed – plots 19-26
- Blockwork on plots 27-30 has been started (flats)
- Manholes in the road being installed
- Internal drainage plots 19-26 being completed
- Main drainage run in and being brought up to level
- Plots 15-18 foundations concreted